[time-nuts] CS reservoir depletion
Mark Sims
holrum at hotmail.com
Sun Jan 16 17:03:09 UTC 2011
Baring any holdover events, the long term output of a properly configured tbolt should exceed any single cesium source or maser. If you assume the 1 PPS signal is always accurate to 5 ns that is an error of 1 part in 1.6E16 at tau=1 year.
Also, there is code in Lady Heather that implements an external disciplining loop that outperforms the one in the tbolt firmware.
---------------------
By the way that is why I repeatedly have asked the list if there is any
long term Tbolt data out there comparing the 1 PPS or the 10 MHz with a Maser.
I hope this is worth two cents.
More information about the Time-nuts_lists.febo.com
mailing list