[time-nuts] Daft idea with the National Grid
Lux, Jim
jim at luxfamily.com
Mon Feb 8 04:45:57 UTC 2021
On 2/7/21 3:28 PM, Dana Whitlow wrote:
> Not daft at all, Andy. Closely related would be measurements of phase
> change between
> near the switched load and far away, over a stretch of a few system time
> constants.
> This would be more challenging, but perhaps doable.
>
> Dana K8YUM
>
If you happen to own something like a steel mill running electric
furnaces or an aluminum refinery, so you can manipulate the load...
More information about the Time-nuts_lists.febo.com
mailing list