[time-nuts] Simulation
J. Forster
jfor at quik.com
Sat Aug 14 19:56:21 UTC 2010
> On 8/14/2010 10:08 AM, J. Forster wrote:
>> FWIW, IMO any engineer who uses undocumented or uncontrolled parameters
>> or
>> instructions in a production design is a fool.
>>
>> If you are that silly, you must fully specify the selection criteria.
>>
>> -John
> This is, easily said, a wonderful goal, and absolute fantasy. It's
> optimistic at best to expect someone to anticipate all contingencies.
> It's certainly good practice to specific critical parameters, but it's
> rarely makes economic sense to specify every possible detail.
OK, important uncontrolled parameters.
For example, I'd consider things like hFE; VCEsat; VCBO, fT and others
important, but not the package capacitance in a low frequency transistor.
There are clearly unimportant parameters and essentially irrelevant ones.
That's where experience and good judgement comes in.
If your circuit is not stable with a high fT part, that needs to be tested
or the design fixed.
> As to relying upon unspecified parameters, most datasheets are woefully
> incomplete. If you are going to use any significant number parts, it's
> unlikely that you'll be able to get everything specified, much less get
> compliance commitments for each parameter. Few vendors are willing to
> do the testing required to guarantee a substantial number of parameters,
> and the simple reason is no one is willing to pay for it.
If your design is that critical, you may have to do incoming
inspectrion/selection or send the parts to a company that does.
> I've spent quite a bit of time dealing with maintenance of military
> systems that would be long obsolete in any other business. After
> obsolescence, the number one problem was parts that meet all published
> specs, but had changed performance so much (for better or worse) that
> they no longer functioned in the application. A common problem is Ft or
> gain, but leakages are often orders of magnitude different. As often as
> not, they were much worse.
Certainly, old Ge power transistors have ICBO issues.
-John
===========
>
> --
> mailto:oz at ozindfw.net
> Oz
> POB 93167
> Southlake, TX 76092 (Near DFW Airport)
>
>
>
>
>
>
>
> _______________________________________________
> time-nuts mailing list -- time-nuts at febo.com
> To unsubscribe, go to
> https://www.febo.com/cgi-bin/mailman/listinfo/time-nuts
> and follow the instructions there.
>
>
More information about the Time-nuts_lists.febo.com
mailing list